Calendar Saturday, September 04, 2010
Chip Rudin, Director

Search

Upcoming Events

Sat, Sep 4th, @8:00am - 05:00PM
Bodenstab Family Reunion
Thu, Sep 9th, @12:00am - 12:00PM
Prayer Quilt Ministries
Fri, Sep 10th, @12:00am - 12:00PM
Bay Area Naz Ladies

Weather

Oakland, OR
Temp: 59°F
Feels Like: 59°F
Humidity: 75%
Speed: 8 mph
Direct.: 20°
Pressure: 30.14 in
NNE
Show more details
Provided by:

Donate Now

Camp Improvements


Camp Operations

Projects
New Well and Water Tank Print E-mail
photo70
New Well & Water Tank: $200,000—$250,00.  We are currently working on estimates for the project.  Our current system will not be adequate when it is time to add a new lodge.
 
Two New Cabins Print E-mail

photo71Two New Cabins: $35,000 ea

$12,000 was donated toward a new cabin by the Roseburg Church on the Rise .

The two cabins will be identical to this one.  A cabin consist of two rooms, each room with it’s own bath & 5 bunks.  One cabin will accommodate 20 people. To view the inside click here.

 
New Nurses Station Print E-mail
New Nurses Station: $50,000
Construction began on the Nurse's Station in September 2009. The Nurse's Station was completed just in time for summer camps.  It has truly been a blessing.  The funds were donated for this project & we give God all the praise!  Click here for pic's.
 
New Lodge Print E-mail

New Lodge: $450—$500,000
The purpose of a lodge is to add a very nice facility for adult retreats.  
It will include a large meeting room, kitchen, & fireplace.  Rooms will
be accessible from inside the facility.
Currently all of our rooms have bunks or twin beds. 
The new lodge will allow us to accomodate two groups at one time.

 
Gym Flooring Print E-mail
Gym Flooring: $30,000—$40,000
Our current gym floor is concrete.  It is cold in the winter & dangerous when someone falls.  We are looking into the new snap together flooring.
 
Brush Eater Print E-mail

Rock Hound Brush eater:
$10,000 Our road to the camp is one mile long with steep banks going up & down.  We have blackberry bushes & scotch broom on both sides leading up to the camp.  Currently it costs $1,100 to have the banks mowed along the entrance road one time & that does not include the side roads.  The above price is for a Rock Hound that fits our backhoe.  You can see it in operation at rockhound.com.   What a blessing this equipment would be to the beautifying of our camp.

 
Minor Print E-mail

PRIORITIES:
TREES LIMBED: $5,000 COMPLETED

TREES ROMOVED: $6,000 
At least 6 trees are at risk of falling in a storm.

Items that can be donated or money given for:
All materials need to be purchased through the camp director so as to keep items the same quality, colors, size, & make.

New heat pump for Ashland Mtg Rm $1,400 COMPLETED
Heater for gym
New Commercial carpet for gym game room 1,000 sq ft
New Commercial carpet for Ashland house meeting room 700 sq ft COMPLETED

Tables: 10 new tables for Dn Hall  $140 ea.
Chairs: 100 new chairs for Dn Hall $18 ea.
Hand tools:  socket sets, wrenches, etc. COMPLETED
New outside light fixtures on cabins [Dusk to Dawn] $20 ea COMPLETED
Hand rails for the gym
Sidewalks to cabins from dining hall
1 refrigerator COMPLETED
1 big chest freezer COMPLETED
2 Washer & Dryers COMPLETED
Dump truck
Volleyball pit
Miniature golf course
New basketball hoops
Several retaining walls
50 new door handles [Master keyed] $750 COMPLETED
6 Queen size beds & mattresses for staff house. COMPLETED
20 bathroom sinks

8 QUEEN MATTRESSES

 
Adopt a Facility Print E-mail

 
Adopt a building or a room:

This is an area where a church, youth, children, men’s, ladies, mission, etc. group, work-n-witness team, couple, or individual can be a tremendous blessing to our camp. 

To adopt a room or building means that you will donate or raise the funds & provide some of the labor, or hire labor, to work on the facility you choose.  We will place a plaque in the room or building stating: “This room adopted by….” or if you choose to remain anonymous we will honor your request.

All materials need to be purchased through the camp director so as to keep items the same quality, color, size, & make.

Room or Facility to adopt:

Staff House:  COST TO ADOPT $4,780
Need 6 Queen Size Beds $3,000                    Queen bed frames $300        
New Door Locks Master Keyed $30                Paint trim & decks $150                                     
New Blinds $800                                                 Paint inside $500


Dining Hall Basement Bathrooms:
New Sinks in both bathrooms $480
Ceramic tile on floors, showers & walls
Painted $200

Bonsi, Birch, Fir, Elm, Maple, Mrytle Cabins:  COST TO ADOPT per cabin $2,250.00 [BONSI $1,175]
                                                                                  COST TO ADOPT per room $1,175

6 cabins 11 rooms—5 bunks per rm
Beds repaired                              New Curtains, Rods, Blinds $60
Paint inside & out  $100             New Mattresses $1,000
New Door Locks Master Keyed $15

Alder & Aspen Cabins:  2 cabins 4 rooms 5 bunks per rm COST TO ADOPT per cabin: $3,690
                                                                                                           COST TO ADOPT per room: $1,895

Paint inside $50                        Paint outside: $100
New Mattresses $1,000           New Door Locks Master Keyed $15
Queen Mattress $500              Queen frame $50
New Curtains $60                     New blinds $40
New Sinks $80                          Showers need a good scrubbing & recaulked

Ashland: 5 rooms COST TO ADOPT $6,360.00
Paint inside & out  $305              New Door Locks Master Keyed $105
New Mattresses $2,600              New sinks  $400
Curtains $300                                Blinds $100 
Queen Mattresses $2,500          Queen frame $50.00
Showers need a good scrubbing & recaulked

Ashland Meeting Room COST TO ADOPT $3,600

Nice refrigerator COMPLETED                New back door  $175.00 COMPLETED
New carpet  $500.00                                New Chairs – padded approx 40 $1,600
Paint inside COMPLETED                        New heat Pump & A/C $1,500.00